Title 24 Energy Compliance in Woodland Hills, CA
Title 24 energy compliance in Woodland Hills typically costs between $800 and $2,500 for most ADU projects, depending on whether you need a prescriptive path, a performance path using HERS raters, or specialized HVAC and lighting documentation. The compliance work happens during design and permitting, before construction starts, and it determines whether your ADU plans get stamped by the city. Fielding ADU Woodland Hills handles this for you as part of our ADU Design & Permitting in Woodland Hills service, so you do not carry a clipboard of forms to a county counter on your own.
If you are planning a garage conversion, backyard unit, or second-story addition in Woodland Hills, your project must meet California’s energy code. That means insulation values, window ratings, HVAC sizing, lighting, and hot water all have to be documented before you pull a permit. Most homeowners find out about Title 24 when their designer or contractor says “the plans are back from the energy consultant.” We do not let it get to the point where you are surprised. Reed Calloway runs our Title 24 compliance work alongside the rest of the permitting package, because a delayed energy report is a delayed permit, and a delayed permit costs you weeks.
Call us at (559) 254-0116 if you are reading this because a city reviewer flagged your plans. We can get a Title 24 report started the same week.

When You Need Title 24 Energy Compliance
Title 24 applies to new construction, additions, and most alterations in California. For Woodland Hills homeowners, the most common triggers are:
- New ADU construction: Any detached or attached accessory dwelling unit needs a full Title 24 compliance report before the city issues a permit. This includes prefab units from Abodu or Cover, and conventional builds using James Hardie siding.
- Garage conversions: When a garage becomes living space, the new room must meet current energy code, not the code from when the house was built. That usually means added insulation, new windows, and a documented HVAC path.
- Room additions over 1,000 square feet: Larger additions trigger more detailed energy modeling. A simple prescriptive checklist may not be enough.
- Window replacements in an ADU or addition: If your project involves swapping windows, the replacement units must meet code standards for U-factor and solar heat gain. Your Title 24 paperwork proves it.
- Plan check corrections from the city: In Woodland Hills, we regularly see plan reviews come back with a request for a Title 24 compliance report or a HERS verification sheet. If you are stuck at this step, call us at (559) 254-0116.
- Selling or refinancing an unpermitted ADU: Some lenders and buyers ask for energy documentation when legalizing an existing unit. The Title 24 report is part of that paper trail.
Our Title 24 Energy Compliance Process
We do not send you to a third-party consultant and hope for the best. Fielding ADU Woodland Hills runs the Title 24 compliance step as part of the ADU Design & Permitting package, with Reed Calloway watching the schedule. Here is how it goes:
- Project intake and site review: We look at your existing plans, lot conditions, and what type of ADU or addition you are building. If you do not have plans yet, we get them moving first.
- Energy modeling and report generation: We run the Title 24 calculation using your project’s specific inputs: insulation R-values, window specs, HVAC type, water heating method, and lighting. For most Woodland Hills ADUs, the report lands within 7 to 10 business days.
- Plan integration: The compliance report gets paired with your permit drawings. If the report identifies a shortfall, such as undersized insulation or the wrong window rating, we adjust the plans before the city ever sees them. This saves a plan check rejection.
- Permit submittal: Your complete package, including Title 24 forms, goes to the Los Angeles Department of Building and Safety. We handle plan check comments and corrections.
- Final verification and close-out: After construction, if your project requires a HERS rater or field verification, we coordinate that visit and get the final documentation filed.

Title 24 Energy Compliance Pricing in Woodland Hills
Title 24 compliance pricing in Woodland Hills typically runs $800 to $2,500 for most ADU and room-addition projects. The range exists because some projects need a simple prescriptive path and others need a performance path with a HERS rater. Here is what drives the number:
- Project size and type: A 400-square-foot garage conversion sits at the lower end. A two-story ADU with a separate HVAC system and oversized windows sits at the higher end.
- HVAC complexity: Ducted systems, mini-splits, and existing HVAC reuse each require different documentation. If we are running a Title 24 report on a conversion that reuses the home’s central air, the modeling takes longer.
- Prefab versus conventional builds: Units from Abodu and Cover come with factory energy specs, which can simplify the report. A conventional build with Tuff Shed-style framing and field-installed insulation requires more verification.
- HERS rater involvement: Some projects trigger a HERS field verification, which adds a separate inspection fee. We tell you upfront if your project falls into this category.
- Plan check corrections: If the city already sent your plans back, we may need to regenerate the report to match revised drawings. That adds an hour or two of work, not a rewrite of the entire package.
The written price for Title 24 compliance lands on your desk before any work starts, same as every other line item on a Fielding ADU project. You approve a number. That number does not move. Call (559) 254-0116 and we will give you a fixed quote for your specific project, not a range that shifts when you sign.
Why Fielding ADU Woodland Hills for Title 24 Compliance
Fielding ADU Builders is the ADU and room-addition specialist inside the Garrison Partners family. We operate independently here in Woodland Hills, and we hold ourselves to the Garrison Standard, which means written pricing before work starts, permitted work done by the book, and a written one-year guarantee on every project. If your Title 24 compliance work fails, gets bounced at plan check because of an error on our side, or misses the schedule we gave you, we come back and make it right at no charge. That is the Garrison Standard working for you.
We also know the local review culture. The Woodland Hills office that processes plan checks sees a high volume of ADU applications, and energy compliance questions are among the most common reasons for resubmittal. We prepare for what this city actually asks, including window orientation, exterior shading, and the interaction between an ADU and the main house’s existing systems. That is local fluency, not boilerplate.
Every crew member on your job arrives background-checked and in uniform. When you call our office, a live person answers, whether you call at noon or midnight. That matters when a permit deadline is approaching and you need to know the status of your paperwork right now.
FAQs – Title 24 Energy Compliance
What exactly does Title 24 energy compliance cost in Woodland Hills?
Title 24 energy compliance in Woodland Hills typically costs $800 to $2,500 depending on project size, HVAC complexity, and whether your build is prescriptive or performance-based. Smaller garage conversions and prefab ADUs sit at the lower end, while two-story units with custom HVAC systems and multiple window types sit at the higher end. Call (559) 254-0116 for an exact written quote on your project.
Is Title 24 the same as a building permit?
No. Title 24 is a separate energy compliance document that must accompany your permit application. You cannot get a building permit for an ADU or room addition in Woodland Hills without a valid Title 24 report on file with the city. We handle both the energy report and the permit package together, so you are not coordinating two vendors.
Can you fix a Title 24 report that the city already rejected?
Yes. If the city flagged your plans for a missing or incorrect Title 24 report, we review what was submitted, identify the deficiency, and correct it. This is one of the most common reasons a Woodland Hills ADU permit stalls, and it is usually resolved within a week once the correct information is submitted. Call (559) 254-0116 with your plan check comments and we will tell you what it will take.
Do prefab ADUs need Title 24 energy compliance too?
Yes. Every ADU, including prefab units from Abodu, Cover, and other manufacturers, needs a Title 24 compliance report before permit issuance in Woodland Hills. Prefab units often have factory energy specs that simplify the report, but the documentation is still a city requirement. Our team works with the factory data to get your prefab ADU permitted without guesswork.
How long does Title 24 compliance take?
For most ADU and room-addition projects in Woodland Hills, the Title 24 report is complete within 7 to 10 business days of receiving accurate project details. If your project requires a HERS rater or field verification, final sign-off happens at the end of construction. We give you a specific timeline in writing before we begin, and it is covered by our 365-day Garrison Standard guarantee.
Get Your Title 24 Compliance Started
If you are planning an ADU, garage conversion, or room addition in Woodland Hills, do not wait until the city asks for your energy report. Start it now, and you will not be the project sitting on hold because the paperwork came in late. Call Reed Calloway and the Fielding ADU Woodland Hills team at (559) 254-0116 for a free estimate on Title 24 compliance and the complete design and permitting package. A live person answers, day or night. The price goes in writing before any work starts. You know exactly what you are approving, and you know who is on the other end of the phone.
Written by Reed Calloway, Owner at Fielding ADU Woodland Hills, serving Woodland Hills.