A Fielding company - serving Woodland Hills, CA
A new modern detached ADU in a backyard

New Detached ADU Cost - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Woodland Hills
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A small deck outside a new ADU
The living room inside a new ADU
A new two-story ADU over a garage
A compact kitchen inside a new ADU
A new modern ADU with wood cladding
A new bathroom inside a converted garage
A former garage converted into a guest house
A second-story addition with a balcony, matched to the original house
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

How Much Does New Detached ADU Cost in Woodland Hills?

A new detached ADU in Woodland Hills typically costs between $185,000 and $410,000 all-in for a turnkey build, with most homeowners landing between $240,000 and $320,000. Permit fees, utility connections, and site work all factor into that number. The price you pay depends on size, finish level, build method (stick-built vs. prefab), and what your specific lot requires.

We put the price in writing before any work starts. That’s not a slogan; it’s how Fielding ADU Woodland Hills operates under The Garrison Standard, the same standard Garrison Partners has built to since 2006.

The bathroom inside a new ADU

New Detached ADU Cost Breakdown (2026)

Here’s what a detached ADU typically costs in Woodland Hills as of 2026, broken down by line item. These reflect what we see on real bids across the neighborhood, from the flats south of Ventura Boulevard up into the hills where slope and access change the math.

Cost Component Typical Range (Woodland Hills, 2026)
Pre-construction & design (site survey, architectural, structural engineering, Title 24 energy calcs) $9,000 – $22,000
City of LA permit fees (building, electrical, plumbing, mechanical, school fees, sewer/water connection fees) $14,000 – $28,000
Site work (grading, foundation, utility trenching, drainage) $18,000 – $45,000
Construction labor (framing to finish) $50,000 – $110,000
Materials (lumber, roofing, windows, drywall, flooring, fixtures) $55,000 – $130,000
Electrical & plumbing rough-in and finish $18,000 – $40,000
Kitchen & bath (cabinets, counters, tile, appliances) $18,000 – $50,000
Soft costs & contingency (plan check corrections, inspections, minor change orders) $8,000 – $20,000

Those numbers assume a code-compliant build on a standard lot. If your property is on a hillside with difficult access, has a steep grade, or needs a retaining wall, add 10% to 25% to the site work line. If the ADU is over a garage and the garage needs structural reinforcement, that also moves the number.

Prefab and modular platforms run differently. An Abodu or Cover unit can come in somewhere between $190,000 and $330,000 depending on size, site conditions, and utility work. A Dvele or Mighty Buildings unit tends to land higher because of the materials and engineering involved. We work with those companies, plus Boxabl and Plant Prefab, and we also build conventionally using James Hardie siding where it makes sense. The right method depends on your lot and your budget, not on what we happen to prefer that month.

What Affects New Detached ADU Pricing in Woodland Hills

  • Lot slope and soil conditions. Much of Woodland Hills sits on expansive clay soil, and the hillside sections south of the 101 and north of Ventura Boulevard can require deeper footings, retaining walls, or special drainage. That runs $15,000 to $60,000 more than a flat-lot build on average.
  • Setback and zoning constraints. The City of Los Angeles has specific ADU setback rules, and many Woodland Hills lots need a setback variance, which is the city’s written permission to build closer to the property line than the standard rule allows. Getting one takes time and design adjustments, which means engineering hours.
  • Utility connection distance. Trenching from the street to a rear-lot ADU can run 40 to 120 feet on deeper Woodland Hills properties. Every foot of trench for sewer, water, and electrical costs money. A short 30-foot run might be $6,000; a 110-foot run across a sloped backyard can hit $25,000.
  • Build method. Stick-built ADUs give you the most design control and run $280 to $450 per square foot in this market. Prefab platforms like Abodu, Cover, or Boxabl can land between $230 and $400 per square foot when site costs are included. The tradeoff is customization versus schedule simplicity.
  • Finish level. Builder-grade bathroom and kitchen fixtures keep costs down. Mid-tier finishes like quartz counters, shaker cabinets, and LVP flooring add roughly $18,000 to $35,000 compared to entry-level. You don’t get luxury for free, but you also don’t need to overspend on a rental ADU.
  • Access to the build site. If your backyard is fenced in with a 36-inch gate and no side yard access, we have to hand-carry materials or remove and rebuild a section of fence. That’s added labor cost – typically $3,000 to $8,000 depending on the distance and material volume.

Reed Calloway, who leads Fielding ADU Woodland Hills, has seen these variables shift bids by $90,000 or more on the same square footage. That’s why we send a uniformed, background-checked crew to look at your lot before we quote it. A price prepared without seeing the actual slope, access, and soil condition is a guess, not a bid.

The bedroom inside a new ADU

How to Save on New Detached ADU

You can cut real money out of a detached ADU in Woodland Hills without cutting corners. The savings come from decisions made before construction starts.

  • Choose a prefab platform where the lot allows it. Abodu and Cover have permit-ready designs that reduce architectural and engineering hours. That can save $4,000 to $10,000 in pre-construction costs. We’re familiar with their plans and can tell you quickly whether one fits your lot.
  • Build to the standard ADU size limit. In LA, a detached ADU can go up to 1,200 square feet (with some exceptions). But a 750- to 850-square-foot one-bedroom costs meaningfully less than a 1,200-square-foot two-bedroom, both in construction and in permit fees, which are partly size-based.
  • Keep it single-story. A two-story ADU requires more engineering, more lumber, more labor. Single-story builds are faster and cheaper per square foot. On a lot with room to spread out, go wide before you go up.
  • Pick standard window and door sizes. Custom sizes mean custom framing and custom ordering. Standard sizes cost less and arrive faster.
  • Do not wait on permits. Woodland Hills is within City of LA jurisdiction, and plan check times can stretch. Every month of delay is a month of holding costs. Starting the process early costs you nothing extra if the work is priced in writing upfront.

The fastest way to find your actual number is a site visit and a written estimate. Call (559) 254-0116 and we’ll price it before any work starts, no pressure and no number that shifts at the door.

Is a Detached ADU in Woodland Hills Worth the Cost?

The honest answer depends on what you want the ADU to do. If you’re building rental income, a $260,000 ADU renting at $2,600 to $3,200 a month in Woodland Hills produces a gross yield of 12% to 15% before expenses – better than most real estate plays in Los Angeles County right now. If you’re housing a parent or adult child, the math is different, and the value is less about return and more about stability.

Property value also moves. A permitted detached ADU generally adds value to a home in this market, though not always dollar-for-dollar against construction cost. The competitive edge comes when you sell: a home with a legal, rented ADU appeals to buyers who want income to offset their mortgage. That’s a real point of differentiation in Woodland Hills, where median home prices sit well above the county average.

Garage Conversion vs. Detached ADU: Cost Comparison

If your property has an existing garage, a conversion is usually the cheaper path to an ADU. Homeowners considering options often ask us to compare the two directly.

  • Garage conversion ADU: typically $110,000 to $190,000, depending on the condition of the existing structure and how much plumbing and electrical work is required. No foundation pour, no new exterior walls, no separate utility trenching.
  • Detached ADU: typically $185,000 to $410,000. You get a separate structure, more design freedom, and often more square footage, but you pay for foundation, four exterior walls, and a full utility run.

If the garage is in good shape and the location works, conversion saves real money. If the garage has foundation issues, asbestos, or you need the garage for storage and parking, a New Detached ADU in Woodland Hills is the better call. We handle both, and we’ll tell you which one makes sense for your lot, not which one makes us more money.

Woodland Hills ADU Permits and Rules: What Costs Get Missed

Permit fees in City of LA include school district fees, sewer facility charges, and park fees for some ADU applications. These are line items that cheap bids often leave out. When we quote an ADU in Woodland Hills, every fee we know about goes in the written price. If the city revises a fee, you’ll see the revision. What you won’t see is a surprise line item added at the end.

Two specific local considerations:

  • Hillside grading permits. If your lot is in a Hillside Area as defined by the City of LA, a grading permit may be required in addition to the building permit. That’s an extra inspection cycle and an extra fee, typically $4,000 to $12,000 depending on the volume of earth moved.
  • Oak tree protection. Some Woodland Hills properties have protected oak trees. If one is within the work zone, you may need an arborist report and a tree protection plan before permits are issued. That adds $1,500 to $4,000 and time to the front end.

These aren’t hidden by us. They’re part of the pre-construction scope we identify early so your written price reflects what the city will actually require.

How the Garrison Standard Applies to Your ADU Budget

The Garrison Code is how we operate: show up in the window, price in writing, build by the book, leave it clean, stand behind it for a year. For an ADU, “stand behind it” has teeth. The Garrison Standard backs workmanship defects for 365 days. If something fails inside that year, we return and correct it at no charge. That’s a Written Guarantee on every project, spelled out on paper: what it covers, how long it runs, and exactly how we make it right.

Most homeowners who come to us have already dealt with a contractor who missed the schedule or moved the price at the door. That’s the thing we don’t do. The Written Price Before Any Work Starts is handed to you before a single nail is driven, every time. The number you approve on day one is the number on the final invoice. If something changes because the city requires it or the soil surprises us, we tell you before we act, not after.

How Long Does a Detached ADU Take in Woodland Hills?

From signed contract to certificate of occupancy, a stick-built detached ADU in Woodland Hills runs 7 to 14 months. Prefab platforms like Abodu or Cover compress that to 5 to 9 months, depending on city plan check times and site readiness.

The biggest time variable isn’t construction; it’s the City of LA plan check and permit approval process, which currently runs 2 to 5 months for a typical ADU application. Our pre-construction work, including survey, design, engineering, and plan check submittal, runs 6 to 10 weeks before the city even starts its review.

Every week of delay costs you money in holding costs. That’s a reason we push clear documentation and complete engineering at submission. A plan check rejection restarts the clock, and we do what we can the first time to avoid it.

If you need a firm timeline before you commit, call us at (559) 254-0116. We’ll look at your lot, your scope, and current city processing times, then give you a schedule in writing with the price – not instead of it.

Should You Buy a Prefab ADU or Build On Site in Woodland Hills?

Both are legitimate. The right answer is about your lot and your goals.

Prefab platforms (Abodu, Cover, Boxabl, Mighty Buildings, Dvele, Plant Prefab) make sense when your lot access is straightforward, you want speed, and you’re comfortable with a limited set of floor plans. The unit gets factory-built while the site work happens, which cuts months off the schedule. What you give up is design flexibility and some material selection control.

Conventional stick-built makes sense when your lot has slope, unusual dimensions, or you want a custom layout. James Hardie siding, specific window placements, a roofline that matches your existing home – those are easier to deliver with on-site framing.

We’re fluent in both. Fielding ADU Woodland Hills works with all the major prefab platforms and builds conventionally. That means the conversation starts with your lot and your budget, not with whatever build method we happen to sell.

Rental Income Potential for Detached ADUs in Woodland Hills

Woodland Hills rental rates depend on the size and finish of the unit. Current 2026 market rates for a new one-bedroom detached ADU run $2,400 to $2,900 a month. A two-bedroom ADU with a full kitchen and laundry can push $3,000 to $3,600 in the neighborhoods closer to Warner Center and the 101 corridor.

On a $270,000 one-bedroom build, that’s a gross annual income of $28,800 to $34,800. After property tax adjustment, insurance, and maintenance, many owners see a net annual return between $22,000 and $28,000 – a payback period of 9 to 12 years, not accounting for property value increase over that same period.

This is not a get-rich-fast number. It’s a steady, reliable yield that beats most bond and dividend alternatives, on an asset that appreciates and that you control directly. Many homeowners in Woodland Hills use an ADU as a long-term rental to offset their mortgage, or as a landing spot for family that buys them time and stability.

FAQs – New Detached ADU Cost

Can you build a new ADU in Woodland Hills for under $200,000?

A detached ADU under $200,000 is possible with a small footprint (under 500 square feet), simple site conditions, a prefab platform like Boxabl, and basic finishes. Most builds run higher, but $185,000 is a realistic floor for a straightforward project on a flat lot with short utility runs. Call (559) 254-0116 and we’ll tell you what your specific lot supports.

What does a 2-bedroom detached ADU cost in Woodland Hills compared to a 1-bedroom?

Plan on $60,000 to $90,000 more for a two-bedroom than a one-bedroom of similar build quality – typically $270,000 to $410,000 for a 2-bedroom versus $185,000 to $320,000 for a 1-bedroom. The difference comes from square footage, an extra bathroom in most designs, and slightly higher permit fees.

Is it cheaper to convert a garage than build a detached ADU in Woodland Hills?

Yes, usually by a significant margin. A garage conversion in Woodland Hills runs $110,000 to $190,000, while a detached ADU typically starts around $185,000. If your garage structure is sound and the location suits your needs, conversion is the budget-friendly route. We’ll inspect the garage and give you an honest comparison.

How much are ADU permit fees in Woodland Hills / City of LA?

Expect to pay $14,000 to $28,000 in total permit and connection fees, including school district fees, sewer facility charges, and City of LA building permit fees. Hillside lots with grading requirements can add $4,000 to $12,000 on top of that. Our written price includes permit fees as a line item from day one.

Can a detached ADU in Woodland Hills pay for itself through rent?

Yes, though it takes time. At current Woodland Hills rental rates, a $270,000 ADU generating $2,600 to $2,900 a month nets roughly $22,000 to $28,000 a year before taxes. That’s a 9 to 12 year payback, after which the rent is income. The math holds best with a well-built unit that doesn’t need constant repair – which is what the 365-Day Done Right Promise is for.

Pricing reflects the Woodland Hills market as of 2026. Fielding ADU Woodland Hills offers free estimates – call (559) 254-0116.

Written by Reed Calloway, who leads Fielding ADU Woodland Hills. Reed and his team build ADUs, garage conversions, and room additions under The Garrison Standard, with written pricing before any work starts and a one-year written guarantee on every project.

What Our Customers Say

★★★★★ 4.7 from 7+ reviews

"Garage conversion with a new bath and kitchenette. Permit was handled by them. Inspection passed first time."

- Sheila B.

"Foundation and slab poured on schedule. Crew kept the yard orderly."

- Marian J.

"Clear price breakdown. Change orders were all in writing."

- Hal P.

Explore more ADU services

Every build below starts the same way: a free site visit and a written price.

Getting started with Fielding in Woodland Hills

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your Woodland Hills team

A local crew that works across Woodland Hills and the towns around it, to the same written standard as every Fielding location.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need ADU help in Woodland Hills? Licensed & insured · Written quotes before work starts response · free estimates
Call (559) 254-0116

Request a Free Estimate

Tell us what's going on in Woodland Hills - we'll get back to you fast. No obligation.

When you send us your details, you accept our Privacy Policy and consent to being contacted by call, text, or email regarding your project, including by the service partners who may complete the work.

Prefer to text? Text Now
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch